Future Street Projects
*Please note this is not a comprehensive list of street projects. These are projects that are in the development stage based on the Fugro street study.
Sunset Drive
Construction type: mill and overlay, full-depth reclamation of roadway, installation of sidewalks/signal improvements.
Estimated cost: $11.8 million.
- Street portion: $4.75 million.
- Utilities portion: $7 million.
Design phase: Design work in progress. 100% signed and sealed plans to be produced by Spring 2025.
Where: Loop 306 near Academy to Foster Road.
Christoval Road
Construction type: reconstruction of roadway, utility rehabilitation, drainage work, installation of pedestrian elements.
Estimated cost: $21 million.
Design phase: 100% complete. Construction timing contingent on identification of funding.
Where: Chadbourne to Ave. L.
Chadbourne St. (From Beauregard to Loop 306):
Plans are 95%. The project will be coordinated as part of the CACP Phase 1 Grant Program. Projected to bid in June 2025. This is a continuation and finalization of the Downtown Chadbourne Streetscape Improvement Project.
Down the road
- Johnson Street. – In design
- Avenue N. – In design
- Main and 19th – Designing in-house
- Ricks Drive – Designing in-house